Big Truck (big-truck.io) is a U.S.-based manufacturer specializing in modular data centers (MDCs) for the crypto mining industry, with turn-key solutions that include grid-to-crypto wallet support. The company designs and builds MDCs in various sizes (10', 20', 40' HighCube, and 40'HC command), where the 20' MDC supports 1/2-1MW with 144 miners, and the 40' MDC supports 1MW-2MW with 336 miners. Their vision is to build the safest, most automated, best quality, UL listed modular data centers by creating a well-engineered design, maximizing built-in automation possible, executing the design in-house right here in the USA, and finishing by fully testing for accuracy, safety, and functionality, all wrapped up in a UL 2755 certification. Key features include SmartPDU, intake/exhaust air temp monitoring, exhaust air velocity, temperature, humidity, main power monitoring, motion detection, access control, surveillance, thermal IR telemetry, fan control, web management platform, VLAN segmentation, network traffic isolation, inbound/outbound firewall rules, IPS/IDS, VPN, multisig wallet/storage consulting, disaster recovery/prevention, data handling, cyber security procedures, cooling options (air, air/evaporative, immersion, heat rejecting paint, solar/environmental cover), multiple E-stop buttons, proper egress, quality manufacturers, safety by design, and high static pressure doors. The team includes network engineers, electrical engineers, DoD contractors, US Navy, industrial electricians with expertise in electrical, network, security, fabrication, nuclear power, and engineering for modular data centers in crypto mining. Location is Mt. Vernon, IL. Contact includes tel/sms: 903-BTC-HODL and telegram: @BigTruckMining. The focus is on crypto mining infrastructure (MDCs, turn-key solutions, power, hosting, network, crypto management, cooling, safety, certification), with no mention of AI/HPC beyond general high-performance potential, hardware sales beyond integrated setups, or self-mining dominance.
Describe your needs and we will be in touch shortly with additional details and pricing information.
Check out the blog for fresh news, tips, and industry analysis to keep yourself ahead of the curve.

June 2026 Bitcoin Mining & AI Infrastructure Update: Kevin O’Leary scales back massive Utah AI project after political backlash, MARA transforms with $1.5B Ohio power plant acquisition, Bitdeer breaks ground on 100 MW Alberta gas-powered site, IREN accelerates Nvidia AI pivot, DMG signs 50 MW AI colocation LOI, plus regulatory moves in North Carolina, Riot patent lawsuit, Strategy’s $10.8B unrealized loss, and Cathie Wood’s $1.5M BTC target.




June 2026 Bitcoin Mining & AI Infrastructure Update: Kevin O’Leary scales back massive Utah AI project after political backlash, MARA transforms with $1.5B Ohio power plant acquisition, Bitdeer breaks ground on 100 MW Alberta gas-powered site, IREN accelerates Nvidia AI pivot, DMG signs 50 MW AI colocation LOI, plus regulatory moves in North Carolina, Riot patent lawsuit, Strategy’s $10.8B unrealized loss, and Cathie Wood’s $1.5M BTC target.


