Active Energy Group PLC (AIM: AEG, OTCQB: ATGVF) is a renewable energy and digital infrastructure company headquartered in the United Kingdom, with operations spanning the UK, Poland (planned), and the United Arab Emirates. The company pursues a diversified strategy that combines lower-carbon fuels, rooftop solar, battery energy storage, and digital infrastructure, including high-performance computing (HPC), AI hosting, and cryptocurrency mining. Active Energy is developing energy-efficient data centres in the UAE for AI hosting and crypto mining, with a targeted pipeline of up to 300 MW capacity. The first 8 MW phase is nearing completion and expected to be commissioned by mid-February 2026, with approximately 60% pre-sold and projected to generate $3.8 million in annualized revenue at around 50% gross margin, funding further expansion to 25 MW. The company has adopted a digital asset treasury strategy, allocating about 30% of its working capital to a diversified portfolio of crypto assets, and may use excess in-house mining capacity to mine and hold Bitcoin as a long-term store of value, subject to governance and risk controls. This approach provides resilience against economic and crypto market volatility while creating multiple pathways to value creation. Active Energy also advances its CoalSwitch proprietary biomass fuel to replace coal with lower emissions, and plans rooftop solar projects and battery storage in the UK. The board remains focused on sustainable growth across renewables, clean fuels, and digital infrastructure. As of January 13, 2026, Active Energy Group is active with ongoing data centre development in the UAE (first 8 MW phase nearing commissioning), crypto treasury management, Bitcoin mining utilization of spare capacity, and renewables/clean fuels progress.
Describe your needs and we will be in touch shortly with additional details and pricing information.
Check out the blog for fresh news, tips, and industry analysis to keep yourself ahead of the curve.

June 2026 Bitcoin Mining & AI Infrastructure Update: Kevin O’Leary scales back massive Utah AI project after political backlash, MARA transforms with $1.5B Ohio power plant acquisition, Bitdeer breaks ground on 100 MW Alberta gas-powered site, IREN accelerates Nvidia AI pivot, DMG signs 50 MW AI colocation LOI, plus regulatory moves in North Carolina, Riot patent lawsuit, Strategy’s $10.8B unrealized loss, and Cathie Wood’s $1.5M BTC target.




June 2026 Bitcoin Mining & AI Infrastructure Update: Kevin O’Leary scales back massive Utah AI project after political backlash, MARA transforms with $1.5B Ohio power plant acquisition, Bitdeer breaks ground on 100 MW Alberta gas-powered site, IREN accelerates Nvidia AI pivot, DMG signs 50 MW AI colocation LOI, plus regulatory moves in North Carolina, Riot patent lawsuit, Strategy’s $10.8B unrealized loss, and Cathie Wood’s $1.5M BTC target.


