30MW Solar Power NV

Property: Nevada High-Irradiance Solar Farm – 30 MW Operational Project

Asking Price: $36,000,000 (Outright Sale – Turnkey Asset)

Overview

Operational 30 MW utility-scale solar photovoltaic (PV) farm in southern Nevada (e.g., near Las Vegas or Amargosa Valley solar corridors), fully grid-connected in the NV Energy market with outstanding low-cost energy delivery. The project generates clean power at an effective all-in rate of ~4.0¢/kWh (blended wholesale/PPA pricing + minimal transmission pass-throughs—leveraging Nevada's exceptional solar resource and market dynamics). Perfect for utilities, corporate buyers (e.g., data centers or tech firms seeking renewables), or yield-focused investors in a region with strong renewable demand and policy support.

Key Specifications

  • Installed Capacity: 30 MW DC (AC output ~24–27 MW)
  • Technology: Single-axis tracking monocrystalline PV modules; central/string inverters; advanced SCADA/monitoring for high uptime
  • Annual Production: ~75–90 GWh/year (capacity factor ~28–35%, driven by top-tier Nevada insolation)
  • Power Economics: All-in ~4.0¢/kWh (competitive merchant or short/medium-term PPA structure; zero fuel/O&M variability supports strong margins)
  • Land & Infrastructure: ~200–300 acres of flat, desert BLM/private land; dedicated on-site substation and transmission tie (e.g., 138/230 kV); perimeter security, access roads, and basic O&M facilities
  • Operational Status: Commissioned 2024–2025; minimal degradation; recent performance reports and inspections available
  • Permitting/Compliance: All federal/state approvals in place (BLM/County, environmental, interconnection); REC-eligible
  • Grid & Market Access: NV Energy interconnection with export options; potential for additional REC/SREC value

Financial & Market Position

  • Revenue Profile: Stable output with priority dispatch in Nevada's renewable-forward grid; merchant exposure or assignable PPA for predictable cash flows
  • O&M Costs: Low (~$15–$20/kW-yr); proven >98% availability
  • Comparable Value: Matches recent Western solar asset sales (~$1.0–$1.5M/MW for mid-size operating projects); replacement costs for new builds exceed $1.2–$1.8M/MW amid delays and supply factors. Nevada's solar advantages (high irradiance, land availability) drive premium interest.

Why This Represents Solid Value

At ~$1.2M/MW, this pricing offers a cash-flowing renewable asset with sub-5¢/kWh economics—highly competitive vs. gas peakers or imports in the West. Nevada's growth in renewables and corporate demand positions it for attractive long-term returns.

Sale Terms

  • Outright asset sale preferred (project equity transfer)
  • Due diligence package available upon NDA (production data, O&M history, interconnection docs, PPA/offtake if applicable)
  • Potential seller carry or JV options for qualified buyers
  • No brokers unless pre-approved

Download the excel format site list.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Details

Capacity
30MW
Location
Nevada
Price c/KWh
4
Price
$36MM

Get a Quote

Describe your needs and we will be in touch shortly with additional details and pricing information.

450+
Colocation Facilities
50+
Mining Facilities
1500+
Miners & Containers for Sale
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
450+
Colocation Facilities
50+
Mining Facilities
1500+
Miners & Containers for Sale

Latest Blog Post

Check out the blog for fresh news, tips, and industry analysis to keep yourself ahead of the curve.

Articles/Blog
The Dawn of the Mining Arms Race: ArtForz and the First Bitcoin GPU Farm

In 2010, a pseudonymous miner known as ArtForz launched the first large-scale Bitcoin GPU farm, igniting the mining arms race and permanently altering Bitcoin’s path toward industrialization.

Daily Market News

Daily Market Updates
Daily Bitcoin Miner News

February 27, 2026 Bitcoin mining roundup: Network hashrate rebounds to 1.12–1.15 ZH/s amid new ASICs and expansions; Bitfarms confirms full pivot to AI/HPC by 2027; Bitdeer sells entire BTC treasury to fund AI growth; IREN records high production; Hut 8 secures $200M loan; Cipher emphasizes HPC shift; Soluna expands hosting; and more.

Daily Market Updates
Daily Bitcoin Miner News
Daily Market Updates
Daily Bitcoin Miner News

Latest Directories Listings

Discover companies involved in bitcoin mining from self-miners, hosting providers, hardware vendors and more

CleanSpark

CleanSpark (NASDAQ: CLSK) is a Henderson, Nevada-based data center developer and Bitcoin mining leader (founded 1987) owning/operating U.S. facilities with competitive energy prices, focusing on compute power and shareholder returns.

Marathon Digital

MARA Holdings, Inc. (NASDAQ: MARA) is a Fort Lauderdale, Florida-based public company (founded 2013) focused on Bitcoin mining, digital energy infrastructure, and transforming excess energy into digital capital, with expertise in AI/edge computing efficiency.

Riot Platforms

Riot Platforms (NASDAQ: RIOT) is a publicly traded Bitcoin mining and data center development company (headquartered in Castle Rock, Colorado) operating facilities in Texas and Kentucky with engineering in Denver/Houston, expanding into HPC/AI.