150-400MW Grid Power OH

Property: AEP Ohio Ultra-Low Power Greenfield Site – 100+ MW Scalable Crypto/Data Center LandAsking Price: Contact for Details (Confidential Land Sale – Development-Ready Parcel in AEP Territory)

Overview

Prime greenfield industrial land in AEP Ohio's service territory, strategically positioned near high-voltage substations for rapid interconnection and supporting 100+ MW (scalable to higher with upgrades) of power-intensive operations like large-scale crypto mining, AI compute, or edge data centers. This site offers ultra-competitive industrial electricity economics—targeting effective blended rates under 2¢/kWh for qualifying large loads through AEP's structured tariffs, industrial contracts, and demand-response options (energy component often in the low-1¢ range + low demand charges). In a mining-friendly state with no bans and pro-business policies, it's ideal for modular/containerized buildout in a cooler climate that minimizes cooling OPEX and boosts hardware efficiency. Ohio's grid strength and economic incentives make this a high-ROI opportunity amid surging demand for low-cost, reliable power in the Midwest.

Key Specifications

  • Land Size: Flexible parcel (e.g., 40–100+ acres available; scalable based on needs)
  • Location: AEP Ohio territory (specific site details provided under NDA; near major transmission corridors and substations for fast tie-in)
  • Zoning: Industrial/flexible – suitable for heavy commercial, data center, or power-intensive development
  • Power Capacity: 100+ MW supported (expandable via AEP interconnection; proximity to substations/transmission lines enables high-load commitments)
  • Utility/Interconnection: AEP Ohio – direct access to robust grid; large-load tariffs (e.g., Data Center Tariff for >25 MW) provide structured rates with minimum commitments for infrastructure protection
  • Power Economics: Ultra-low effective rates under 2¢/kWh all-in for large committed loads (leveraging low energy component ~1¢/kWh range + demand charges ~$3–$5/kW; among the nation's lowest for industrial scale via AEP tariffs and wholesale/PJM dynamics)
  • Infrastructure Readiness: Ample space for mining containers, substations/transformers, cooling systems, security fencing, and expansion buffers; flat, developable terrain ready for rapid modular buildout
  • Development Fit: Low residential density minimizes noise/heat complaints; modular design enables fast deployment and phased scaling (start at 50–100 MW, expand rapidly); Ohio’s cooler climate significantly reduces cooling costs and improves ASIC/GPU efficiency
  • Regulatory Environment: No statewide or local bans on crypto mining; Ohio remains supportive with protections against discriminatory regs (e.g., Blockchain Basics Act influences); local EDCs offer incentives for job-creating projects

Financial & Market Position

  • Power Cost Edge: Ultra-low rates dominate mining profitability, providing a massive competitive advantage over higher-cost regions (e.g., vs. ERCOT or PJM averages); shielded from volatility through industrial tariffs
  • Revenue Potential: High IRR from low opex, scalable MW, and efficient operations; ideal for self-mining, colocation, or AI/high-density compute amid growing demand
  • Comparable Value: Recent Midwest industrial land deals for power-intensive sites reflect premiums; new interconnection and development costs alone can exceed $10–$20M/MW-scale, bypassing queue delays here
  • Incentives: Potential tax abatements, EDC grants, and economic development support available for qualifying projects

Why This Represents Strong Value

Securing a site with under 2¢/kWh economics in AEP Ohio territory is increasingly rare amid surging data center/AI demand and new large-load tariffs requiring commitments (e.g., 85% minimum billing for >25 MW). This parcel offers near-substation access, scalability to 100+ MW, and fast-track potential—delivering superior margins vs. higher-rate regions or delayed greenfield builds. Replacement costs (land, studies, upgrades) would far exceed this opportunity in today's market.

Sale Terms

  • Outright land sale preferred (confidential; price/terms upon qualified inquiry)
  • Due diligence package available upon NDA (includes site surveys, AEP interconnection feasibility, tariff modeling, environmental data)
  • Potential seller financing, JV, or phased options for qualified large-load buyers
  • Engage broker for site visits, AEP large-load application guidance, and EDC incentive coordination
  • No brokers unless pre-approved

For exact location, pricing, power studies, or to request NDA/due diligence, contact us. This is a rare, high-potential power-optimized site in one of the most cost-competitive U.S. territories for crypto and computer.

Download the excel format site list.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Details

Capacity
100MW+
Location
Ohio
Price c/KWh
2
Price
$3MM

Get a Quote

Describe your needs and we will be in touch shortly with additional details and pricing information.

450+
Colocation Facilities
50+
Mining Facilities
1500+
Miners & Containers for Sale
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
450+
Colocation Facilities
50+
Mining Facilities
1500+
Miners & Containers for Sale

Latest Blog Post

Check out the blog for fresh news, tips, and industry analysis to keep yourself ahead of the curve.

Articles/Blog
The Dawn of the Mining Arms Race: ArtForz and the First Bitcoin GPU Farm

In 2010, a pseudonymous miner known as ArtForz launched the first large-scale Bitcoin GPU farm, igniting the mining arms race and permanently altering Bitcoin’s path toward industrialization.

Daily Market News

Daily Market Updates
Daily Bitcoin Miner News

February 27, 2026 Bitcoin mining roundup: Network hashrate rebounds to 1.12–1.15 ZH/s amid new ASICs and expansions; Bitfarms confirms full pivot to AI/HPC by 2027; Bitdeer sells entire BTC treasury to fund AI growth; IREN records high production; Hut 8 secures $200M loan; Cipher emphasizes HPC shift; Soluna expands hosting; and more.

Daily Market Updates
Daily Bitcoin Miner News
Daily Market Updates
Daily Bitcoin Miner News

Latest Directories Listings

Discover companies involved in bitcoin mining from self-miners, hosting providers, hardware vendors and more

CleanSpark

CleanSpark (NASDAQ: CLSK) is a Henderson, Nevada-based data center developer and Bitcoin mining leader (founded 1987) owning/operating U.S. facilities with competitive energy prices, focusing on compute power and shareholder returns.

Marathon Digital

MARA Holdings, Inc. (NASDAQ: MARA) is a Fort Lauderdale, Florida-based public company (founded 2013) focused on Bitcoin mining, digital energy infrastructure, and transforming excess energy into digital capital, with expertise in AI/edge computing efficiency.

Riot Platforms

Riot Platforms (NASDAQ: RIOT) is a publicly traded Bitcoin mining and data center development company (headquartered in Castle Rock, Colorado) operating facilities in Texas and Kentucky with engineering in Denver/Houston, expanding into HPC/AI.